GE LMS100 Gas Turbine Start

Power Generation Startup
Under 1 Hour
10 Modules

This course is a detailed description GE LMS100 Gas Turbine Start process. The course is broken into ten modules - Control, Ventilation, Oil System, Valve Cycling, Fuel Gas Test, Turbine Roll, Purge and Fire, Conditions Check, Self Sustaining, and Synch and Load. This course is designed for Control Room Operator (CRO) level and is ideal for individuals looking to learn more about the GE LMS100 Gas Turbine Start. This course is applicable to power generation, combined cycle and simple cycle power plants.

Request Pricing for GE LMS100 Gas Turbine Start Course

"*" indicates required fields

Name
This field is for validation purposes and should be left unchanged.

GE LMS100 Gas Turbine Start

1. Control

5:00
Details

2. Ventilation

5:00
Details

3. Oil System

5:00
Details

4. Valve Cycling

6:00
Details

5. Fuel Gas Test

5:00
Details

6. Turbine Roll

5:00
Details

7. Purge and Fire

5:00
Details

8. Conditions Check

5:00
Details

9. Self Sustaining

5:00
Details

10. Synch and Load

5:00
Details

Learn More

Award-Winning 3D Training. Exponential Cost Savings.