Steam Plant Critical Valves (Combined Cycle)
View Course
This course is a detailed description of the of the control screens during the startup, blending and loading of a 2X1 combined cycle power plant with GE 7FA Gas Turbines and a GE D11 Steam Turbine. The course is broken into twelve modules - Start Familiarization , CT Prestarts , ST Prestarts, DCS Prestarts, FG and Aux Boiler, Condenser Vacuum,Lead CT Start, ST Preparations, ST Roll and Sync, Loading the ST and Lag CT, Blending and Loading, and Duct Burners. This course is designed for a control room operator level and is ideal for individuals looking to learn more about the startup of a combined cycle power plant. This course is applicable to power generation, combined cycle power plants.
Request Pricing for Combined Cycle Startup (2X1) with GE 7FA Gas Turbines and GE D11 Steam Turbine Course
"*" indicates required fields
Combined Cycle Startup (2X1) with GE 7FA Gas Turbines and GE D11 Steam Turbine
1. Start Familiarization
2. CT Prestarts
3. ST Prestarts
4. DCS Prestarts
5. FG and Aux Boiler
6. Condenser Vacuum
7. Lead CT Start
8. ST Preparations
9. ST Roll and Sync
10. Loading the ST and Lag CT
11. Blending and Loading
12. Duct Burners